Cebula Hall Saint Martin’s University
Lacey, Washington
LEED 2009 Platinum 97 Points – highest scoring LEED building in the Western Hemisphere.
Project Type
Private Sector Design/Build & LEED Platinum
Roles
LEED Management, design build services for HVAC,
outdoor geothermal loop, energy management system
(EMS), photovoltaics, and plumbing design.
Roy F. Heynderickx PH.D. (Saint Martin’s University:
President):
“We are very proud of what we have been able to achieve
with this building and are sincerely grateful to Sunset Air
for their vital role in its success”
Facility Description
Three story 25,310 square‐foot educational facility for the College of Engineering.
Project Highlights
- 90+ % Effective Tempeff heat recovery system.
- Geothermal HP system
- State of the air Energy Management System (EMS)
- Photovoltaic array producing 20KWH Annually
- 73% energy use reduction over ASHRAE baseline
Project Cost
$5,700,000 or $225/SF
LEED 2009 Platinum
97 Points – highest scoring LEED building in the Western Hemisphere
Energy Use Index (EUI)
Predicted: 14.5 KBTU/SF
Actual: 11.8 KBTU/SF